‘POEM’ Platform

In Context

  • ISRO successfully launched the PSLV Orbital Experimental Module or ‘POEM’.

What is POEM?

  • The PSLV Orbital Experimental Module (POEM) activity performs in-orbit scientific experiments using the spent PS4 stage as an orbital platform.
  •  It is the first time that the PS4 stage would orbit the earth as a stabilised platform. 
  •  POEM derives the power from the solar panels mounted around the PS4 tank and a Li Ion battery.
  • It navigates using four sun sensors, a magnetometer, gyros & NavIC
  • POEM has a dedicated Navigation Guidance and Control (NGC) system for attitude stabilisation, which stands for controlling the orientation of any aerospace vehicle within permitted limits.
    •  The NGC will act as the platform’s brain to stabilise it with specified accuracy.
  • It carries dedicated control thrusters using Helium gas storage. It is enabled with a telecommand feature.
    • POEM carries six payloads including two from Indian Space Start-ups M/s Digantara and M/s Dhruva Space, enabled though IN-SPACe and NSIL.

Has ISRO repurposed and used PS4 rocket junk earlier?

  • The Indian space agency first demonstrated the capability of using PS4 as an orbital platform in 2019 with the PSLV-C44 mission that injected Microsat-R and Kalamsat-V2 satellites into their designated orbits.
    •  The fourth stage in that mission was kept alive as an orbital platform for space-based experiments.

Source:IE

 

 Recent Posts
PAC Flag shortcomings of Swadesh Darshan Scheme

Syllabus: GS2/Governance, Schemes Context Public Accounts Committee (PAC), led by K.C. Venugopal, criticized the Tourism Ministry for poor execution of...

Read More..
Contradiction Between High Per Capita Income vs Poverty Levels in Indian States: SC

Syllabus: GS2/Issues Relating Poverty & Hunger Context Recently, the Supreme Court of India Bench, led by Justice Surya Kant, raised...

Read More..
Lokpal Forms Inquiry Wing to Probe Graft Cases Against Public Servants

Read More..
How was the Tungabhadra Dam Gate Swept Away?

Syllabus: GS3/Infrastructure Context A flood alert has been sounded downstream of the Tungabhadra dam in Karnataka’s Koppal district after one...

Read More..
Management  of Ballast Water

Syllabus :GS 3/Environment  In News Tamil Nadu Water Resources Department (WRD)  observed  that Kamarajar Port is the main reason for...

Read More..